16 Feb, 2021 → by ClaimboUser415222
Turn off power so meter can be replaced

1

College Station at 1000 St. John's Street Unit 1000-304 Elon NC 27244: Unit 304 keeps losing total power. Multi repairs have been made, we feel total meter /breakers needs replaced. We and Kemco electrical had scheduled a job ahead of time with Duke Energy. They get to the job only to tell us, that they need an Allen Wrench to disconnect phase 1. They didn't have so not prepared to complete the job. Instead of calling the supervisor to get the tool needed. Must reschedule for the following week.
Helpfull? 0 likes

Post your comment:



Do you want to help? Probably you've just been in a similar situation, know the solution and want to help? Perhaps you are just a kind person who has advice on the merits. Please write your comment — you can do a good breed.

If you are actual Representative of Duke Energy you can contact the user using the comment form and help resolve the situation. The user can always mark his complaint as "resolved". Maintain your brand image, it is FREE.
Copyright © 2024 CLAIMBO.COM. All rights reserved.