Biggest mistake in remodeling I have EVER made.
1
My small bath remodel was to take between one week and ten days. After 8 unbearable weeks of debris mess, caustic materials used, paint that peeled off the walls like rubber, spills of unknown fluids on the floor, unauthorized withdrawal of funds from my bank account, improper installation of electrical and plumbing, damage to new vanity I purchased upon their request and I have yet to use my shower. Two items had to be eliminated from the contact because they could not figure out how to install two small doors! Everything they did had to be redone. It has been a year and the CSL B has been informed. I am a disabled senior who only wanted a safe shower. plumbing User's recommendation: NEVER.