15 Feb, 2012 → by ClaimboUser672911
Sloppy work and damaged property
agreed on a price to replace pool lines, price changed the first day of work with the contractor saying the concrete was thicker than expected( did you not measure it? ) once concrete was cut and after 20lbs of concrete being dumped into the pool which just got a brand new liner, I realized they had cut the main power supply to the pool house and re-concreted over it without repair, was told this is not their responsibility. lines were installed and all debris was left in the pool. The system was not run or tested. I held back final payment waiting for a resolution to the power lines until I recieved a letter from his lawer threatening to sue me. After consultation with my lawer I was told it was not worth persuing because the cost of a lawsuit would exceed what I still owed.