1 Jan, 2018 → by ClaimboUser913647
failure to build as contracted
*SOLVED
5
1 defective installation of floors, did not use glue, did not use tonque and groove, both had been specified by architect, both had been agreed upon in writing, refused to remedy, refused to refund 2 defective installation of hurricane rods, installed the rod into the plate board, made it look like it was done right, whereas in fact he never installed the required anchor underneath the board in the concrete foundation, thus rendering the hurricane rod useless. Deceived the building inspector and sued me to get additional pay for the rod installation. 3 defective installation of ridge beams, did not install end teco's as required by town and architect. 4 failed to secure utilities causing pipe freeze up and water damage during construction 5 major damage to deck, siding, and roof unrelated to the renovation intended.