27 Jun, 2011 → by ClaimboUser364185
Slow and everything cracking on bathroom remodel
We had 2 bathrooms completely gutted and replaced by Diamond Kitchen and Bath, which are located in Feasterville, PA. We went with the company for the one stop shopping. Boy, was that a mistake. The job took 4 months longer than projected because there was only one contractor working each day. In addition, the quality of the work is so poor. The ceiling started cracking within 1 month of install where the joists are taped. Instead of tearing the tape out and putting in new tape and spackle, they just respackled. Of course it's cracked. And within 6 months, the caulk was coming off the tub and the grout is cracking on the walls in both bathrooms. Despite assurances that the grout was sealed - it never was. Now I will have to re-grout both baths and it is under 2 years from install. The counter tops were cut wrong, there was a problem hanging the shower doors in the master bath. I could go on. Run, don't walk, away from this contractor.