Ontario Energy Board




Outdated Data? Please send us
an actual information or new logo.
Ontario Energy Board

Average Rating:

1.77 / 13 votes / 1 reviews
P.O. Box 2319
Toronto
Ontario
Canada


Category: Utility Services

Other Info

1 877 632 2727 (Within Ontario)
+1 416 314 2455
P.O. Box 2319
2300 Yonge Street
Toronto , Ontario
Canada – M4P1E4


Claimbo.com is not affiliated, associated, authorized, endorsed by, or in any way officially connected with Ontario Energy Board , or any of its subsidiaries or its affiliates. The use in this website and/or in related promotional print or video material of trademarked names and images is strictly for editorial and descriptive purposes.

Complaints & Reviews — Ontario Energy Board

A representative showed up at more door stating that he needed to inspect my furnace, air conditioner and pipes leading to those units to ensure that they are compliant with new government standards. Upon my question who he worked for and what the consequences were if mine were deemed non compliant. I was informed that I had... Read more➤

Poor quality of construction, level of qualification of masters.

As everyone knows, when one person works, repairs can take months, with that in mind, we decide to take over the company so that everything happens faster. Never and no one would recommend the construction of the company Real, because the repair of bathrooms and toilets in 2-2.5 weeks instead of 6 weeks. Once upon a time, there was one person who worked so slowly that he could not even imagine. For the entire duration of the repair work, the workplace has been only 3-4 times, during the rest of the time it was delayed from 1-1.5 hours. Saying that coming at 9:00, came right if at 10:00 to 10:30. We every morning come to our apartment that to work (living in a different place, because living in a repairable apartment was impossible) in time for the time he said, but the same delayed every time. There were breaks every 30 minutes, several times the worker could even go for 1-1.5 hours without starting, which gives the impression that it is not possible to go to another object with the help of someone. And now for the work itself, the tiles are laid differently, the tiles are very different from each other, the baths are placed on the floor and only on 3 legs, which the worker had thought did not know wall joints because when placing the bathtub appear, the gap between one corner of the bathtub and the wall and at the other corner was already forced, leaving that the panel that came with the bathtub did not fit normally and did not screw it in the middle so that it doesn't come off. All the taps are incorrectly attached, all the holes are visible, we have been told every time about a situation and all the months have been tried and turned around. Three walls were redesigned, The door boxes were remodeled, the cabinets were placed in trouble and one of them was so very close to the side wall that the door could not be lowered without stopping against the same wall. At the very beginning of the work drilled through the wall, which was made 4 holes in the expensive kitchen panel, and many holes inside the kitchen furniture. Every time I went inside and outside the doorway with the door so that the locks were changed after they were frozen and stuck inside the house two days after the end of the repair, multiple contracts were not beaten. the door was not open. It seems that we do not take anyone into account at all. Once you have placed the tiles, you will repeatedly have to have a remake because the drawing was not assembled correctly. Everything had to look like, all deeds and words, talking to these people is not meaningful, each time fed with it either scroll-show everything will be completed but it was seen that working up to the ears yet. After the completion of the repair will have to take a person with high qualifications, who after 4 days remodeled a lot. Then there was also a problem with the bath and an even bigger surprise was the ventilation which finally did not end its work, because taking a bath, the bathroom had the feeling of being in the sauna. Next, the redesign of the ventilation connections will also show that they have a very small diameter, which was also the cause of the problem. We put a second fan next to it so that you do not have to break the ceiling structure, as well as cut the entire perimeter is already cracked, the repair is only 2 weeks. Every time I go inside I remember all the nightmares related to repairs and the fact that everything was made there, the spirit is immediately damaged. Wash next after the whole apartment, because the dust was everywhere, with the films was the first day all covered, but after a week the passport also broke, which will also cause dust. There are also complications with buying a bath, because it was impossible to say exactly what to take, thank God its bigger bath just didn't come and I bought it a little. sizes multiple times.

Read more...

Copyright © 2023 CLAIMBO.COM. All rights reserved.